Our in-house team manages the design, application, installations and aftercare, providing occupiers, landlords and investors with high quality assets through our expert commercial solar panel installers.
Rigorous product selection to only use Top Tier solar products with direct access to manufacturers
We ensure health & safety is managed to the highest standard, both during the installation and as part of the design
In-house engineering team accredited with MCS, CEng and CHAS, adopting the best in class IET Code of Practice
Dedicated project manager, ensuring highest quality and minimal disruption from start to completion

Absolar's solar team will liaise on your behalf with multiple parties to obtain necessary permissions and paperwork before a solar project, including grid permission, structural survey, site planning, health and safety and procurement.
Key features
Each project is assigned with an Absolar project manager who looks after on-site operations, ensuring quality, limiting disruption, and serving as a single point of contact for you to stay up-to-date.
Key features

My number one goal is to manage every project smoothly, without causing any disruption to the business operation of the clients, so I can tell each client that whilst our work starts, yours doesn't stop."
Akash Yadav, Absolar Project Manager

No. Absolar's in-house team carries out design, project preparation, installation and aftercare directly. The engineers who design a system are the same team accountable for delivering it, with no third-party installers involved.
Absolar's in-house engineering team is MCS certified, CHAS accredited, and holds RECC membership and Cyber Essentials certification, adopting the IET Code of Practice as standard on every project.
Absolar's team handles all pre-installation paperwork on your behalf, including grid permission applications, structural surveys, site planning and procurement, so you don't need to coordinate multiple parties yourself.
Yes. Every project is assigned a dedicated Absolar project manager who oversees on-site operations, quality assurance and day-to-day communication from start to completion.
Absolar uses a rigorous product selection process, sourcing only Top Tier solar panels and equipment with direct access to manufacturers, rather than working through third-party distributors.
Health and safety is managed to a high standard throughout both the design and installation phases, with quality assurance checks performed daily by the assigned project manager.

Government | Public Sector
Gipping Court is a key administrative facility for Suffolk County Council located on Russell Road in Ipswich. The site serves as a functional hub for local government operations, characterized by its urban commercial architecture and prominent position within the town's civic district.
...

Commercial | Arts & Culture
The De La Warr Pavilion was designed by architect Erich Mendelsohn and structural engineer Felix Samuely. As a Grade I-listed building, the project required a system that could be installed without placing excessive loads on the original structure.
Stewart Drew, CEO and Director of the De La Warr Pavilion, comments,
As we celebrate the 90th year of the De La Warr Pavilion, I couldn’t be prouder to see these solar panels being installed. It’s a milestone moment and one that reflects our ongoing dedication to environmental sustainability, strengthening the long-term resilience of the building and reducing its operational impact on the environment.
...

Industrial | Engineering
The project is located at Units 23 & 24 Aston Road in Bromsgrove, serving as a primary operational hub for All4One Engineering Limited. The site features a standard industrial profile with expansive roof space suitable for a large-scale solar array, designed to support heavy engineering operations and specialized machinery.
...









