Care for each roof like our own


Site surveys are to check the roof condition and accessibility of your electric panels. It usually finishes within 2 hours and won't cause any disturbance to your business operation.


“I pay great attention to the details during my site survey from the location of electric board to the optimal cable routes, so when it comes to the stage of installation, the process could be most efficient and running smoothly.
Jen Biju Varghese, Solar Project Associate


"Commercial solar projects have many moving parts and usually involve multiple parties before the installation could actually start. Absolar's mission is to be a single point of contact for our clients so they don't have to navigate through the bits and bobs themselves."
Nic Cory, Director of Absolar
The installation process normally lasts 2 to 4 weeks, depends on the size of the building. Our team works hard to ensure that our panel installation process has minimal disruption to your day-to-day operations.
Health and safety has always been paramount throughout our process. This is not only important for our team, but it also allows our clients confidence in that if they wish to visit the roof and see how installation is going themselves, they have that option.


Witness test
Witness test is the final step before a solar system could go live. It is performed by the power distribution networks (formally known as DNO or Distribution Network Operator) to ensure that the local network can accept the electricity generated and continue to operate within the require legal limits.


"Absolar are amazing partners - no nonsense, minimal bureaucracy, great analytics and fully deliver on their promise.”
Dr Stephen Rowe, Managing Director DEKRA UK

Commercial | Science Park
The work is taking place at Gamma House, where a conventional diesel-run backup power generator is to be replaced with a significantly more sustainable solution that cleverly integrates on-site solar generation, battery storage and grid connectivity.
Back-up power is essential for all business continuity, yet projects of this nature remain relatively uncommon due to their technical complexity and the investment required to deliver effective systems that meet both operational requirements and wider ESG objectives. This complex project has only been made possible through deep collaborative work with experts in renewables, data science, IT and physical infrastructure.

Commercial | Equestrian
Hurst Grange Farm House is a characterful equestrian facility located in the rural setting of Hurst, near Reading. The site features traditional farm structures and outbuildings that provide ample roof space for renewable energy generation, supporting the high energy demands of a working equestrian estate.

Community | Religious Building
St Francis Church is a vital community hub located in Valley Park, Chandler's Ford. The site serves as a central point for weekly services, local gatherings, and diverse outreach programmes, requiring a reliable and consistent energy supply to support its multifaceted operations throughout the week.